General contractor of biomass pellet and alternative fuel (SRF, RDF, ASR) factories and bulk and granulated feed mixing plants.
EPC Contractor for the feed and biomass industry.
Project management, planning and integration.
Procedure
Design
From idea to execution with NPT
NPT, as a general contractor (EPC Contractor), offers full investment service, as well as implementation of assumptions at all stages of design, production and assembly. We deliver complete production lines with full technological and construction documentation with industry guidelines. Individual stages are performed by our specialists with proven experience.
FIRST
STAGE
Study
Feasibility
Investment assumptions
Preliminary cost estimate
General concept of technology
After determining the investor's minimum requirements, we prepare a preliminary technology proposal, general budget assumptions and a conceptual diagram.
SECOND
STAGE
Projects
Technology projections
Technical specification
Detailed cost estimate
We select dedicated technical solutions. We carry out a project with technical specifications and a detailed quote, which are the basis for developing individual technology.
THIRD
STAGE
Production
Executive projects
Delivery coordination
Production of machines and devices
After signing the contract, we carry out projects specified in the specification (annex to the contract - List of Responsibilities). We order the necessary technology components, We coordinate the deadlines and completeness of deliveries.
FOURTH
STAGE
Construction
Factories
Technical supervision
Construction and infrastructure
Mechanical and electrical installation
We begin construction of infrastructure and deliver machinery and equipment. We supervise teams assembling machinery and power and control cabling. We accept individual stages and cooperate with the Investor's services.
FIFTH
STAGE
Transmission
Factories
Calibration of automation parameters
Operator training
Investment delivery
We program the basic parameters of the program for automatic control of technological processes. We train operators in the use of the program and individual machines. We report readiness for operation.
SIXTH
STAGE
Exploitation
Factories
After-sales support
Service and maintenance
Spare parts deliveries
We actively assist operators in their daily work, supporting them with our experience. We guarantee full access to consumables. If necessary, we provide efficient service.
The importance of the procedure for the optimal implementation of the investment
The above procedure is in line with industrial standards, which are based on modern norms resulting from many years of experience in carrying out investments related to the construction of feed mixing plants, biomass pellet plants and other industrial facilities.
The most important stage of the investment process is Phase Two. Its result is a precise definition of technical and technological possibilities, recommendation of available and optimal solutions and their location in the budget and other possibilities of the Investor.
The Second Stage is an in-depth analysis of the entire production process, taking into account the needs of the Investor. Its effect is the presentation of a production technology that not only meets the initial assumptions, but, most importantly, exceeds them. Such service allows the design of a factory with expansion in mind, which is only a matter of time for most of our Clients.
The holistic vision of the investment created by our experts provides measurable savings during operation, counted in hundreds of thousands of złoty. The ability to predict technological nuances eliminates the risk of unforeseen collisions and technical limitations.
We do not impose or propose rigid limitations in technological solutions. However, we are distinguished by flexibility and a very individual approach to each topic related to a specific investment. Our methodology is open to all suggestions and the most original ideas.